Project Files
Our project reports and executables.
Project Reports 5 items Main project deliverables. All main reports are under this directory.
April 30, 2026 Final Report Our last report containing the final specifications and structure of StreamLang.
Download
March 13, 2026 Detailed Design Report Our fourth report.
Download
December 22, 2025 Analysis and Requirements Report Last report of first semester. Contains requirements analysis and work plans.
Download
November 21, 2025 Project Specification Document Our second report.
Download
October 24, 2025 Project Information Form Our first report. Introduction to StreamLang.
Download